Radial Jet Enhancement is a patented technology to
daily production of existing marginally
producing oil and gas wells. The technology is
oriented toward existing oil and gas wells in
North America at depths of 4,500 feet and
shallower. The project is in response to the
need to economically extract more
oil and gas from existing wells using a much
more cost effective method than existing
technologies.
Radial Jet Enhancement has made it feasible to
enhance production from more than 1.7 million
wells that would otherwise be cost prohibitive
to recover. This represents a total potential
untapped market of more than $50 billion. Oil
reserves that otherwise would have remained
beyond the reach of conventional technologies
can now be recovered efficiently and
economically. In some cases, production
recovers to a point equal to or exceeding that
of the well’s initial production.
Well
done in East Texas in March 2006
If the movie does not play right
away, please have patience.
The movie is downloading . . .
Radial Jet Enhancement targets the existing oil and
gas wells in North America 4,500 feet deep and
shallower. This Enhancement technology is a much
more cost efficient process over conventional
techniques. The process enables jetting lateral
holes further into the strata opening up the
formation to allow for freer flow of
hydrocarbons into the well bore, thus increasing
the production rate of an existing well.
All of this can be accomplished with
operating costs that are an order of
magnitude less expensive than
current lateral drilling techniques.
Lower operating costs combined with
the resulting
increased oil production from the
well means previously unrecoverable oil can now
be recovered efficiently and economically. The
target market is indeed large in that it is
estimated that 87% of the known oil reserves in
the United States remain in the ground.
Utilizing existing well shafts, the Radial Jet
Enhancement technology can laterally enter areas in
a "wheel and spoke" fashion and penetrate up to
300 feet, in up to 16 different directions, at
any given depth. The technology has the ability
to drill up to 8 laterals in only two days, as
opposed to a typical period of four weeks per
well.
The
figure below demonstrates how Radial Jet
Enhancement
can drastically expand the production area
within a given field. An average well will pull
petroleum from an area of up to 120 feet from
the well bore. However, each Radial Jet
Enhancement
extends up to 300 feet from the well bore, thus
increasing the area of production several fold.
Traditional well bore configuration, pulling
from 120 feet, equates to a total volume of pay
zone of 271,296 cubic feet. Each lateral of 300
feet will pull from over 360,000 cubic feet.
That’s 1,440,000 cubic feet on four laterals.
Radial Jet Enhancement utilizes patented design and
manufacturing technology of the Deflecting Shoe
Boot and pressure water jetting. The figure
below more precisely illustrates the process.
The Radial Jet Enhancement process works on both
new and existing wells. Radial Jet Enhancement
performs best on formations of low permeability
such as depleted wells that are ready to be
capped because they are no longer economically
viable. This negates the continual need for new
explorations and drilling. Fields that are ready
to be deserted and have about 80% of the
reserves still in ground can be maximized to
pull another large portion of the in ground
reserve.
Features of Radial Jet Enhancement include:
The process is fast. Average
time the rig is on the well is only two days
Cuts a one inch diameter hole horizontally up
to 300 feet from the well bore
Lateral holes can be drilled at several levels
Benefits:
Increases production rate and recoverable
reserves from marginal wells
Improves injection rates in water
disposal/injection wells
Allows directional treatment of wells e.g.
acid, steam, CO2, etc.
Allows multi-layer application in thicker
reservoir zones
Most effective on old, low productivity wells
No
need for large, expensive rotary rigs
No
mud pits that can damage the environment
No
casing milling equipment necessary
No
additional stimulation required
Average operation duration is two days per
well. Thus limiting the time the well is out
of production
No
logging expense required
No
need to change well-bore configuration
If you are an oil or gas well operator and
believe that the application of Radial Jet
Enhancement technology can enhance the production
and overall value of your wells, please
click here
to
fill out our operator questionnaire. One of our
representatives will contact you shortly.
1544 Sawdust
Rd, Suite 100, The Woodlands, TX 77380 Tel: (281) 367-0386
Fax: (281) 596-7212
Copyright 2005
Energy Capital Group All Rights Reserved.
THIS
WEBSITE AND THE CONTENT CONTAINED HEREIN IS NEITHER AN OFFER TO
SELL NOR A SOLICITATION TO BUY SECURITIES; NEITHER ARE
SECURITIES BEING OFFERED TO NOR WILL SALES BE EFFECTED WITH
PERSONS IN THE STATE OR JURISDICTION IN WHICH YOU (THE VIEWER)
RESIDE WITHOUT EXEMPTION.